Land Hub
Threat model · publicly published

Public Risk Register

Eight named risks. Each with severity, likelihood, mitigation, and (where relevant) the named partner the mitigation depends on. Publishing the threat model first is itself a legitimacy move.

r1-legal-exposure-ukSev: highLik: lowPartner: ICMP / ITJP

UK legal exposure if any forensic activity is interpreted as practising regulated work without authorisation.

MitigationReferral-only doctrine. No sample, scene, or remain ever touched under TLTE auspices. Documented in Doctrine rule 1.

r2-sl-state-hostilitySev: highLik: high

Sri Lankan state characterisation of the Hub as separatist infrastructure.

MitigationStandards-only public posture. No homeland operations during Aarambam. UK jurisdiction, civilian framing, OHCHR-aligned. Multi-community partner-list visible on every page.

r3-uk-terrorism-actSev: mediumLik: low

UK Terrorism Act 2000 §12/13 — encouragement / glorification proximity if framing drifts.

MitigationCivic Protection Doctrine guardrails apply. Final-Days Dossier framing reused. Velicham refuses glorification framing.

r4-dna-admissibilitySev: highLik: lowPartner: ICMP

Any DNA work conducted outside ISO/IEC 17025 accreditation would be inadmissible and undermine future accountability.

MitigationHub never runs a lab. Doctrine rule 1 is non-removable. Partner accreditation status verified before referral.

r5-survivor-harmSev: highLik: low

Inadvertent re-traumatisation if survivor stories surface on Hub pages.

MitigationNo survivor intake on any Hub surface. Murad Code applied. Routing to PEARL / ITJP / OHCHR. Velicham refuses casework intake.

r6-funding-captureSev: mediumLik: medium

Donor concentration that could compromise the Hub's independence.

MitigationMulti-jurisdiction trustees with Shamir 3-of-5. Donor list above £5,000 publishable annually per CIC and CIO reporting.

r7-data-integritySev: mediumLik: low

Tampering with citations registry or doctrine changelog.

MitigationAppend-only changelog. SHA-256 stamped dossiers. Two-Archon sign-off. Mirror published to Reading Room and Vault RB-12 manifest.

r8-mission-creepSev: highLik: medium

Pressure to expand into operational service delivery before Graduation Gates close.

MitigationSequencing Doctrine Gate 4 binds operational expansion. Hard rule in doctrine. Public refusal of any premature deployment ask.